Installation of two 2,700t arcs for the Toruń Bridge, Poland

Loading... Views | May 19

ALE was contracted to complete the skidding, assembly and float installation of two 2,700t arches over the 500m wide river Vista, in Toruń which will become a traffic bridge and is a major investment in the region. Case study http://www.ale-heavylift.com/case-study/installation-two-2700t-bridge-arches-torun-poland/